IHS Inc., Home - http://www.ihs.com Subscriber Login | How To Subscribe | Standards Store
 

Petrochemical Resources

Industry Home Page

Products & Solutions

Industry News

Newsletter

Literature

Web Seminars

Request a Price Quote


Top Documents

API STD 1104 - Welding Of Pipelines And Related Facilities

API SPEC 5L - Spec For Line Pipe

API STD 650 - Welded Steel Tanks For Oil Storage

API RP 14C - Recommended Practice For Analysis, Design, Installation, And Testing Of Basic Surface Safety Systems For Offshore Production Platforms

API STD 653 - Tank Inspection, Repair, Alteration, And Reconstruction


Worldwide Locations
Asia Pacific (APAC) Europe, Middle East, and Africa (EMEA) Americas

NRC Issues License for Spent Nuclear Fuel Storage Facility in Utah


February 24, 2006

 
Tools for Engineers
IHS sells standards collections and regulatory information for the oil & gas, petrochemical and utilities industries. For more information and a price quote, please complete the form below.
API Collections
ASME BPVC
ASTM Collections
CyberRegs - Compliance library
IHS Standards Expert - Standards DB
IEEE Collections
NEMA Collections
AWS D1.1 Welding Code
First Name:

Last Name:

Email address:
The Nuclear Regulatory Commission (NRC) issued a license to Private Fuel Storage LLC (PFS) to construct and operate an independent spent nuclear fuel storage facility in Skull Valley, Utah.

PFS, a consortium of nuclear power utilities, intends to construct the site on the reservation of the Skull Valley Band of Goshute Indians, about 50 miles southwest of Salt Lake City. The facility is intended to provide temporary above-ground storage, in large cylindrical casks, of up to 44,000 tons of spent nuclear fuel from U.S. commercial nuclear power plants.

Although the license, issued Feb. 21, is effective immediately, it does not authorize PFS to begin immediate construction of the facility. PFS will be required to arrange adequate funding before NRC will authorize construction. In addition, PFS must obtain necessary approvals from other agencies, including the Bureau of Land Management, the Bureau of Indian Affairs and the Surface Transportation Board.

The license is effective for a period of 20 years.

Source: U.S. Nuclear Regulatory Commission.


  ENERGY & PETROCHEM ENGINEERING STANDARDS NEWS  

Frost: N. American Biofuels Market Faces Challenges   Jun 26, 2008
Biofuels enjoy many inherent advantages such as regulatory, infrastructural, environmental, geopolitical and agricultural support, according to Frost & Sullivan.

DOE Seeks to Invest up to $90M in Advanced Geothermal Energy Technology, Research   Jun 26, 2008
The U.S. Department of Energy (DOE) issued a funding opportunity announcement (FOA) for up to $90 million over four years to advance the R&D and demonstration of next-generation geothermal energy technology which will harness the earth's interior heat extracted from hot water or rocks.

EPSA: FERC Briefing Confirms Importance of Both Existing, New Generation to Reliability   Jun 26, 2008
The following statement was released by Electric Power Supply Association (EPSA) President and CEO John E. Shelk after a briefing from the Federal Energy Regulatory Commission (FERC) on the rapidly rising costs associated with existing and new power generation infrastructure:

Trilliant Uses Freescale Tech Based on IEEE 802.15.4 Protocol to Deploy Wireless Smart Grid in N. America   Jun 24, 2008
Trilliant Inc. delivered a two-way fixed wireless smart grid deployment in North America based on the Institute of Electrical and Electronics Engineers Inc. (IEEE) 802.15.4 compliant media access control/physical layer (MAC/PHY) from Freescale Semiconductor.

FAQ on EU Response to High Oil Prices   Jun 23, 2008
This document contains responses from the European Union (EU) to frequently asked questions about rising oil prices.

Farm Bill Addresses Commercialization of Advanced Biofuels   Jun 23, 2008
The U.S. Congress passed a farm bill that is designed to accelerate the commercialization of advanced biofuels, including cellulosic ethanol, encourage the production of biomass crops and expand the U.S. Department of Agriculture Renewable Energy and Energy Efficiency Program.

EPSA Releases Paper on Rising Costs of New Power Plants   Jun 23, 2008
In advance of a briefing on rising power plant costs expected at the June 19 meeting of the Federal Energy Regulatory Commission (FERC), the Electric Power Supply Association (EPSA) released an issue summary, The Rising Cost of New Power Generation Projects Argues for Greater Reliance on Competitive Markets and Procurement.

More...

IHS is an ISO 9001 registered company.


Update Page | Privacy | Legal | Careers | Feedback | Site Map