IHS Inc., Home - http://www.ihs.com Subscriber Login | How To Subscribe | Standards Store
 

Petrochemical Resources

Industry Home Page

Products & Solutions

Industry News

Newsletter

Literature

Web Seminars

Request a Price Quote


Top Documents

API STD 1104 - Welding Of Pipelines And Related Facilities

API SPEC 5L - Spec For Line Pipe

API STD 650 - Welded Steel Tanks For Oil Storage

API RP 14C - Recommended Practice For Analysis, Design, Installation, And Testing Of Basic Surface Safety Systems For Offshore Production Platforms

API STD 653 - Tank Inspection, Repair, Alteration, And Reconstruction


Worldwide Locations
Asia Pacific (APAC) Europe, Middle East, and Africa (EMEA) Americas

Florida Power & Light Seeks License for New Nuclear Plant


April 14, 2006

 
Tools for Engineers
IHS sells standards collections and regulatory information for the oil & gas, petrochemical and utilities industries. For more information and a price quote, please complete the form below.
API Collections
ASME BPVC
ASTM Collections
CyberRegs - Compliance library
IHS Standards Expert - Standards DB
IEEE Collections
NEMA Collections
AWS D1.1 Welding Code
First Name:

Last Name:

Email address:
Florida Power & Light (FPL) intends to submit a license application to the Nuclear Regulatory Commission (NRC) that could lead to a decision to build a third nuclear power plant in the state.

The announcement that FPL could "potentially pursue a new nuclear plant in Florida" came as the state's largest electric utility filed a document updating its 10-year plan on future electricity generation with Florida Public Service Commission.

FPL spokesperson Rachel Scott said, "Filing the letter of intent (for a combined construction and operating license) with the NRC is a way of signaling our interest in keeping the option open. It's the very first step."

Scott said the utility plans to streamline the approval process by building a plant design that already has been approved by the NRC.

A site for a potential new power plant is expected to be chosen in the next three years. Obtaining the license and building the facility could take more than a decade to complete. The company has slated 2009 as a target date to file the application.

Source: U.S. Nuclear Regulatory Commission (NRC).


  ENERGY & PETROCHEM ENGINEERING STANDARDS NEWS  

Frost: N. American Biofuels Market Faces Challenges   Jun 26, 2008
Biofuels enjoy many inherent advantages such as regulatory, infrastructural, environmental, geopolitical and agricultural support, according to Frost & Sullivan.

DOE Seeks to Invest up to $90M in Advanced Geothermal Energy Technology, Research   Jun 26, 2008
The U.S. Department of Energy (DOE) issued a funding opportunity announcement (FOA) for up to $90 million over four years to advance the R&D and demonstration of next-generation geothermal energy technology which will harness the earth's interior heat extracted from hot water or rocks.

EPSA: FERC Briefing Confirms Importance of Both Existing, New Generation to Reliability   Jun 26, 2008
The following statement was released by Electric Power Supply Association (EPSA) President and CEO John E. Shelk after a briefing from the Federal Energy Regulatory Commission (FERC) on the rapidly rising costs associated with existing and new power generation infrastructure:

Trilliant Uses Freescale Tech Based on IEEE 802.15.4 Protocol to Deploy Wireless Smart Grid in N. America   Jun 24, 2008
Trilliant Inc. delivered a two-way fixed wireless smart grid deployment in North America based on the Institute of Electrical and Electronics Engineers Inc. (IEEE) 802.15.4 compliant media access control/physical layer (MAC/PHY) from Freescale Semiconductor.

FAQ on EU Response to High Oil Prices   Jun 23, 2008
This document contains responses from the European Union (EU) to frequently asked questions about rising oil prices.

Farm Bill Addresses Commercialization of Advanced Biofuels   Jun 23, 2008
The U.S. Congress passed a farm bill that is designed to accelerate the commercialization of advanced biofuels, including cellulosic ethanol, encourage the production of biomass crops and expand the U.S. Department of Agriculture Renewable Energy and Energy Efficiency Program.

EPSA Releases Paper on Rising Costs of New Power Plants   Jun 23, 2008
In advance of a briefing on rising power plant costs expected at the June 19 meeting of the Federal Energy Regulatory Commission (FERC), the Electric Power Supply Association (EPSA) released an issue summary, The Rising Cost of New Power Generation Projects Argues for Greater Reliance on Competitive Markets and Procurement.

More...

IHS is an ISO 9001 registered company.


Update Page | Privacy | Legal | Careers | Feedback | Site Map