![]() |
Subscriber Login | How To Subscribe | Standards Store |
|
EC Approves Construction of French Nuclear Power PlantOctober 25, 2006 // Published as a news service by IHS
The plant is proposed for the Flamanville, France site and will have a power output of 1630 MW. Under Article 41 of the Euratom Treaty, as well as subsequent articles, persons and undertakings engaged in the industrial sectors relating to nuclear activities must notify the EC of investment projects relating to new installations and also to replacements or conversions. The EPR design has been developed since the 1990s by EDF and AREVA-ANP, in partnership with German electricity companies. The EPR project is aimed at achieving the highest possible level of
nuclear safety, environmental protection and economic performance. The EPR uses
17% less fuel than the types of reactor currently operating in France. Its
expected service life is 60 years. [1] Under Article 41 et seq. of the Euratom Treaty concerning investments in the nuclear field. Source: European Commission.
Frost: N. American Biofuels Market Faces Challenges
Jun 26, 2008
DOE Seeks to Invest up to $90M in Advanced Geothermal Energy Technology, Research
Jun 26, 2008
EPSA: FERC Briefing Confirms Importance of Both Existing, New Generation to Reliability
Jun 26, 2008
Trilliant Uses Freescale Tech Based on IEEE 802.15.4 Protocol to Deploy Wireless Smart Grid in N. America
Jun 24, 2008
FAQ on EU Response to High Oil Prices
Jun 23, 2008
Farm Bill Addresses Commercialization of Advanced Biofuels
Jun 23, 2008
EPSA Releases Paper on Rising Costs of New Power Plants
Jun 23, 2008
|
|
IHS is an ISO 9001 registered company. Update Page | Privacy | Legal | Careers | Feedback | Site Map |